Insert Schedule

The Insert Schedule tool places the corresponding schedule from the project directory on the sheet. The active view must be a sheet and a schedule already created. To do this, use the command Create Schedule.

  1. Open the desired sheet to place the schedule.

  2. Click Reinforcement tab > Schedule panel > Click dropdown arrow at Create Schedule > icon_InsertSchedule (Insert Schedule).

The corresponding schedule to the active sheet will be detected automatically and placed in the lower-left corner.

  1. Move the schedule to the desired position on the reinforcement sheet.

../../_images/mpic_InsertSchedule.png